Info:Bellarine Basin Improvements Package 3 Clifton Springs – Tank Connection and Pipe Laying Works
Cost:$800,000
The work at Clifton Springs Tank (CST) involved the construction of approximately 480 metres of 711mm OD MSCL bypass pipeline down Andersons Road and connections into the
existing tank and nearby water main.